Two weeks later, I went over to my buddy's shop (I.P.M. Auto Service) and started the open heart surgery, as he likes to call it. As with most projects within this engine bay, 50% of the time is just getting stuff out of the way before you can even start replacing all of the parts. We didn't use every part in the kit, but here is what we did replace:
- Both Valve Cover Gaskets
- Camshaft Chain Tensioner Gaskets
- Both Camshaft End Caps
- And if my memory is correct the the driver side rear Camshaft Seal
At the end of the day it was about 5 hours including a oil change to complete. The end result is to be determined at this point. When the the Valve Covers were removed, there was a fair amount of oil that leaked so it hard to tell what is new and what is previous. I'm think a few more days of driving should burn off the residual oil and then we can take a closer inspections to look for any leaks. With the oil change, I put in 0w-40, so if there is a leak, the thin nature of this weigh should find it when warm. Hopefully we are leak free.